View Full Version : Worked Example 2.2


drquek
06-29-2009, 08:46 PM
Run Worked Example 2.1 assuming:

6 hour design storm for the location.

100 year I= 25 mm/hr

Use the following temporal pattern:

0.29, 0.20, 0.16, 0.12, 0.14, 0.09

Area 2 and 3 both have 25% impervious area.

What is highest peak discharge and the time to peak?

lee_onntik3
06-30-2009, 06:13 PM
The highest peak discharge is 57m3/s.
The time to peak is 6:00

teikkah
06-30-2009, 06:21 PM
peak discharge 43.1 cu.m/s at time 6:00

saifulmasma2
06-30-2009, 06:38 PM
Ans example 2.2 Qp = 57 m3/s.