drquek
06-29-2009, 08:46 PM
Run Worked Example 2.1 assuming:
6 hour design storm for the location.
100 year I= 25 mm/hr
Use the following temporal pattern:
0.29, 0.20, 0.16, 0.12, 0.14, 0.09
Area 2 and 3 both have 25% impervious area.
What is highest peak discharge and the time to peak?
6 hour design storm for the location.
100 year I= 25 mm/hr
Use the following temporal pattern:
0.29, 0.20, 0.16, 0.12, 0.14, 0.09
Area 2 and 3 both have 25% impervious area.
What is highest peak discharge and the time to peak?