3.4 Worked Example 3.2
To compute the water levels for Q= 22, 44, 88 and 160 m3/s for the Jalan Tun Razak Culvert (3 m wide, 4 m deep, twin box culvert) and another 800 m long twin 3.35 x 3.35 m box culvert further downstream which discharges into Sg. Klang.
Above what Q are the Culverts (JTR and 800 m culvert downstream) flooded?
See Case Study in Appendix A, Section 2.3 (filename: tunrazak.zip)
To compute the water levels for Q= 22, 44, 88 and 160 m3/s for the Jalan Tun Razak Culvert (3 m wide, 4 m deep, twin box culvert) and another 800 m long twin 3.35 x 3.35 m box culvert further downstream which discharges into Sg. Klang.
Above what Q are the Culverts (JTR and 800 m culvert downstream) flooded?
See Case Study in Appendix A, Section 2.3 (filename: tunrazak.zip)